Temporary School Gymnasium by MIDE architetti + Paolo Didonè

03 May of 2014 by

Architects: Paolo Didonè, MIDE architetti
Location: Via Mascagni Pietro, 34, 41035 Massa Finalese Modena, Italy
Area: 1725.0 sqm
Year: 2013
Photographs: Alessandra Bello

Structural Engineers: Beniamino Didonè, Bruno Gonzato
Electrical Systems: Studio Gasparotto
Mechanical Systems: Riccardo Baggio
Fire Safety: Maurizio Sonda
Sole Responsible Of The Proceedings: Manuela Manenti
Director Of Works: Paolo Ligori
Construction Safety Manager: Antonio D’Auria
General Contractor: Fiorese s.r.l.
Cost: 1 366 270,31 €

From the architect. Following the 2012 earthquake that struck Emilia Romagna a competition was announce to rebuild a destroyed school gymnasium in Massa Finalese.
The site, which is located in the north-east side of a school park, is the border between the urban area and the country side, suggesting the new building to be the new “connecting tool” between these two realities.

The main focus is to create a structure able to soften the urban/country “boundary” and to characterize the whole of the school park as well:
A new identity blooms through

Particular-Studio-by-Particular-Architects_dezeen_ss_1

Previous:

Particular Architects build themselves a reconfigurable studio

jpeg

Next:

A Hill On A House by Yuko Nagayama & Associates

You may also like

Post a new comment

six + 5 =